Friday, 20 August 2010

Holiday pictues.

As promised here are some pictures that we took while we were in Preggio for the last couple of weeks.

The weather was very changeable while we were out there and there was one tremendous storm where the house that we were staying in was almost struck by lightening and all of the power was completely knocked out....in fact it ended up being worse than we originally thought, a lot of the dimmer switches in the house and the motor to the electric gates were all burnt out by the lightening and all need to be replaced...note to self 'have a surge protector fitted'. We also sat on the terrace and admired some wonderful sunsets, this one below was particularly special.



Back to the house....I would estimate that 3/4 of the old structure has been demolished and when the builders come back in early September they will clear the rubble to sort the stones to be reused and start preparing to work on the foundations. The larger stones from doorways have been set aside already along with the beams and the roof tiles.






It was quite sad to see the old house knocked down but it would not have been structurally sound had we tried to have it renovated rather than completely rebuilt.

We are going to use as many of the old materials as possible and will be as sympathetic as we can with the interior design to try and keep the house looking traditional.

Here are a couple of pictures that were taken from the position where the house will stand



The well has been positioned above the house, while this is obviously somewhat dictated by the location of the water, it is exactly where we wanted it to be and it will be clad with traditional stone and made into a feature.



When i ve gone through all of the photos I shall upload some more.

Wednesday, 18 August 2010

Back from holiday!

Just back this week from a lovely 2 week break in Preggio. We actually stayed in the farmhouse that's just below ours on the side of the valley and it was a lovely house. It was great to be able to pop up the hill and wander around the site and look at the materials that have been set aside from the old ruin for use in the build. Although August is generally a shut down month for the builders in Italy there were people on site most days but at the moment the work is more about preparation than actual building. Connections are now ready for electricity and water (from the newly drilled well as there will be no mains water) and the site is waiting to be cleared of the old stones ready for the foundations to be worked on in September.

We took some great photos while we were out there and I shall publish some later when I'm at my pc.

Wednesday, 28 July 2010

Photo update......

After what sounds like a very interesting business trip to Sicily, Geoff has returned and sent me some more photographs.

The old structure is coming down and the builders will sort through the stones to set aside the ones that we can re use.


The process of drilling the well is also underway. The Geologist believes that we should find water at depths of around 55-60 metres. There will be no mains water so the well will be our main source of water.


Friday, 9 July 2010

The house that started it all.....

We had a wonderful holiday in Umbria in 2009 and we fell head over heels in love with the region.

This link is for the house that we stayed at for the holiday and it is a wonderful property...

http://www.homeinitaly.com/detail.php?v_id=173

If our property turns out to be as beautiful we will be ecstatic.

Some more pictures taken today






The work has started!

This week the builders have moved on to site and have started clearing the land around our ruin and removing some overgrown trees to make the building accessible.

They have then erected some scaffolding and removed the roof tiles which will of course be re used.


The next process will be to take down the building one stone at a time and the stones will also be set aside and re used.




Saturday, 19 June 2010

Finally we own our ruin

On Friday June 4th we completed the purchase of Celle Di Sotto. Later this month the painstaking process of taking down the current structure stone by stone will begin. As the photos come through I will post them on the blog.....